Diseño de un espigón de fin de playa en cayo Libertad, Punta Hicacos (Varadero) como parte del manejo de zonas costeras
Average rating
Cast your vote
You can rate an item by clicking the amount of stars they wish to award to this item.
When enough users have cast their vote on this item, the average rating will also be shown.
Star rating
Your vote was cast
Thank you for your feedback
Thank you for your feedback
Date
2009
Metadata
Show full item recordAlternative Title
Design of a beach end groyne in Cayo Libertad, Punta Hicacos (Varadero), as part of coastal zone managementAbstract
Para estabilizar el sector de playa en el extremo este de Cayo Libertad, Punta Hicacos, se propone la construcción de un espigón con una longitud de 290 m y un ancho de corona de 8 m, compuesto por un núcleo de rocas de 3 m de ancho y por dos capas de escollera de recubrimiento con un peso de 3.4 ton para el tronco de la obra y 3.6 ton para el morro. La cota de coronación será +1.20 m, nivel en el que dará terminación una losa de hormigón de resistencia Rbk: 300 kg/cm2. La obra se integrará al uso recreativo de la zona a través de un paso peatonal que permitirá la contemplación del paisaje y la pesca a cordel. El espigón servirá de contención lateral a la arena que es transportada por efecto de la deriva litoral hacia el Canal de Buba, contribuyendo a estabilizar este sector de playa al favorecer la acumulación de sedimentos, el incremento del ancho de playa y la protección del borde costero para uso turístico. Con la aplicación de esta solución se trabaja además por lograr el objetivo de establecer un programa único de recuperación y mantenimiento de la playa de Varadero en toda su extensión, lo que permitirá un mejor manejo de la zona costera con el uso más racional de los recursos financieros y técnicos.To stabilize the beach sector in the end east of Cayo Libertad, Punta Hicacos, intends the construction of an groin with a longitude of 290 m and a width of crown of 8 m, composed by a core stone of 3 m of wide and for two layers of quarrystone with a weight of 3.4 ton for the structure trunk and 3.6 ton for the structure head. The bench mark of coronation will be +1.20 m, level in the one that will give termination a flagstone of resistance concrete Rbk: 300 kg/cm2. The work will be integrated to the recreational use of the area through a pedestrian step that will allow the view of the landscape and the fishing to line. The groin will serve from lateral contention to the sand that is transported by effect of the coast drift toward the Channel of Buba, contributing to stabilize this beach sector when favoring the accumulation of silts, the increment of the beach width and the protection of the coastal border for tourist use. With the application of this solution one also works to achieve the objective of establishing an unique program of recovery and maintenance of the Varadero beach in all their extension, what will allow a better handling of the coastal area with the most rational use in the financial resources and technicians.